Aluminum form ties secure aluminum forms in order to pour the desired wall thickness. These ties are used predominantly for poured wall basement foundations around the country. Ties feature easy-break notches that break horizontally flush with the wall. Location notches allow placement of reinforcing steel. Available in full or nominal sizes from 6-12 inches. Sold 100 per bundle.
Available in both Full & Nominal sizes.
Designed for easy break off.
3,600 safe work load with a 2:1 safety factor.
Made from high strength steel to ensure consistent quality.
Ties are compatible with all major aluminum forming systems in the industry.